The Blue Coat School

Gaskell Contracting services ltd was Employed to excavate and form 2 new walk way paths in the garden of the blue coat school.
Scope of work. Excavate and from the new path, lay concrete edgings, lay new subbase, Tarmac and and finish off with A Resin finish.

Exposed Aggregate Concrete Floor

Pour concrete slab leaving the finish 75mm below FFL,  stage 2, install heated floor, stage 3 pour concrete slab to FFL, and grind, to leave exposed aggregate finish

Greater Manchester police Generator Project

Swop over 2 main Back up Generators from Greymare la police station, to Armed responce facility on claytonbrook rd. This was a bespoke job for GCS LTD, we was requires to undertake trial holes and  ground investiagtion reports, & to deliver both generators to both sites, inc crane lifts, & provid back up generators while the 2 generators was swopped over. We also carried out building works to the substation door ways to Take the Asco unit.

Merseyrail Birkenhead

Prepare, paint, and seal Existing floors. This Building is the main workshop where merseyrail maintain and repair their fleet of trains. These floors have not been cleaned for approx 10yrs.